S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
242. A production licence holder must measure the shut-in pressure of the pool before and after the production test.
O.C. 1252-2018, s. 242.
In force: 2018-09-20
242. A production licence holder must measure the shut-in pressure of the pool before and after the production test.
O.C. 1252-2018, s. 242.